Reported What our labels mean

How we know: The City of Brownsville's announcement, USA Today's report, the Texas Department of Licensing and Regulation project record, and the structural engineer's account published by Walls & Ceilings.

Facts as known at: May 2, 2025 (City of Brownsville); Apr. 30, 2025 (USA Today); Oct. 11, 2025 (Walls & Ceilings); TDLR project record read Oct. 29, 2026

ConstructionCase study

Starbucks opens its first 3D-printed store, a Brownsville drive-thru with an estimated $1.2 million build cost

PERI 3D Construction built the 1,400 sq ft store with printer maker COBOD. A state filing puts the estimated cost at $1,198,000; there's no comparison to a conventional store.

Starbucks opened its first 3D-printed store in the U.S., a 1,400-square-foot drive-thru and pickup shop on Boca Chica Boulevard. Here's what happened, what it cost, and what went wrong.

Cost and outcome (as of May 2, 2025)

What opened

The City of Brownsville announced the store as the nation's first 3D-printed Starbucks. It's a drive-thru and pickup location of 1,400 square feet, and the city listed hours of 4:30 a.m. to 11:30 p.m. on weekdays and 5 a.m. to 11:30 p.m. on weekends. Store manager Ricky Arreola was quoted in the city's announcement. (City of Brownsville, May 2, 2025)

USA Today reported that the store has no indoor seating and offers drive-thru and mobile pickup service only, and that it's the chain's fourth shop in a city of more than 190,000 people at the southern tip of Texas. Manuel Chacon, the city's director of communications and marketing, gave USA Today the May 2 opening date, and Starbucks confirmed it and referred USA Today to videos of the project it had posted on social media. (USA Today, Apr. 30, 2025)

Who built it and how

Starbucks said the store was built by PERI 3D Construction, a German company, USA Today reported. PERI says on its website that it uses a construction printer from COBOD, USA Today reported; COBOD says its BOD2 printer lays concrete through a steel nozzle. (USA Today, Apr. 30, 2025)

Case Engineering, which did the structural and MEP engineering, says the architect was NewGround. Its design used perimeter concrete columns cantilevered from the foundations to resist high winds near the Gulf Coast, and those columns also support the printed concrete skin against sideways wind loads. The roof uses wood trusses. (Walls & Ceilings (Case Engineering))

Case project manager Devin Klein said the printed walls can't be drilled afterward, "as it would compromise the structure, so all of our MEP design work had to be finalized upfront." (Walls & Ceilings (Case Engineering))

What the state record shows

The Texas Department of Licensing and Regulation's accessibility record lists the project as "new concrete 3D printed commercial building shell" with interior work for a pickup-only Starbucks with a drive-thru. It gives an estimated cost of $1,198,000, private funding, 1,400 square feet, a start date of March 16, 2023, and a completion date of Sept. 24, 2024. Its status reads "Inspection Complete." (Texas Department of Licensing and Regulation, TABS2024006040)

What went wrong

Our follow-up question for Starbucks

How does the Brownsville store's cost and build time compare with a conventional drive-thru of the same size, and will Starbucks print more?

Sources

  1. City of Brownsville, “Brownsville makes history with nation's first 3D-printed Starbucks,” May 2, 2025. brownsvilletx.gov
  2. USA Today (Melina Khan), “Starbucks opens 1st 3D printed store in Texas,” Apr. 30, 2025. usatoday.com
  3. Walls & Ceilings, “Case Engineering Provides MEP, Structural Design on World's First 3-D Concrete Printed Starbucks,” Oct. 11, 2025. wconline.com
  4. Texas Department of Licensing and Regulation, TABS project TABS2024006040, read Oct. 29, 2026. tdlr.texas.gov

Disclosure: [not in copy] Editor placeholder

© 2026 Real World Wire. Written October 29, 2026.